How the concrete steps calculator works
Solid steps on the ground are stacked blocks: the first step is one rise tall, the second two rises, the third three. Multiply width by going by rise, then by 1 + 2 + 3 for three steps.
In our test of 17 online calculators, three counted only one rise per step and came out at about half. Check for that if you compare answers.
Rise, going and a landing
The rise is the height of each step and the going is the depth of each tread, front to back. A landing at the top is a slab the full height of the steps, so it adds a lot of concrete for its size.
Questions
For steps 1m wide with a 170mm rise and a 280mm going, about 0.31 m³ with 10% extra, or 35 x 20kg bags of Concrete Mix.
The rise is the height of one step. The going is the depth of the tread you stand on.
Check that each step is counted at its full height from the ground. A three-step flight has six rises of concrete in total, not three.
Enter a landing depth if the top step needs room to stand and open a door. Because the landing sits at full height, check the extra concrete it adds before you decide.
Goes with this job
Disclaimer
This calculator gives estimates from the sizes you enter, using manufacturers' published figures and standard geometry. It is not engineering or design advice. Footing, slab and beam sizes must come from your plans or engineer. Allow for site conditions, spillage and uneven ground. Check quantities with your supplier before ordering. Allmat accepts no responsibility for decisions made using these estimates.
Sources
- Cement Australia: Concrete Mix
- Allmat arithmetic (this calculator)
Last checked 5 October 2026.
Cite this page
Allmat, "Concrete steps and stairs calculator", https://allmat.com.au/concrete-calculator/steps, checked 5 October 2026.