Hume installation guide
Tiling Direct to Cavity Unit Installation Instructions
The official Hume Doors instructions for installing an Evolution cavity unit in a wall that will be sheeted and tiled, such as an ensuite or bathroom. It covers the approved fibre cement wall linings and the extra fixing requirements that keep the unit rigid behind a tiled finish. Read it on this page or download the PDF.
What this covers
- Approved wall linings
- Fixing requirements for tiled areas
- Track and back post fixing
- Sheeting and tiling over the unit
Key things to remember
The essentials from this guide, at a glance.
- Use minimum 6mm fibre cement sheeting (Type A or B, Category 3 to AS/NZS 2908.2); approved linings include Hume Cemboard (Prima), James Hardie Villaboard and CSR CeminSeal.
- In a tiled area the track must be fixed through every pre-punched hole.
- Fix the back post to the stud with at least 5 evenly spaced screws or nails, and fix through the bottom plate.
- Make sure the cavity unit is plumb and level before sheeting and tiling the wall.
Share this document
Email it to yourself
Loading…
This is the official Hume Doors document. Read it on this page or download the PDF. For the most current version, please confirm with Hume Doors. Allmat supplies the full Hume Evolution cavity range across Adelaide and South Australia , build yours and add it to a quote.
