Hume installation guide
Evolution Timber Cavity Unit Installation Instructions
The official Hume Doors installation instructions for the Evolution Timber cavity sliding unit. The pack comes in two parts: Part 1 covers preparing the frame and installing the cavity into the opening, and Part 2 (kept sealed until the door goes in) covers preparing and hanging the sliding door. Read it on this page or download the PDF.
What this covers
- Preparing the opening
- Installing the cavity frame
- Head/track and closing jamb
- Preparing the door
- Hanging and adjusting the door
Key things to remember
The essentials from this guide, at a glance.
- The pack is split in two: open only Part 1 (frame) first, and keep Part 2 sealed until you are ready to install the door.
- Opening height is the door height plus the state allowance, and width is 2 × door + 10mm for a flush pull or 2 × door + 60mm for a flush jamb. The unit size is tight, so allow extra for packing.
- In SA the pack includes the closing jamb.
- Leave the temporary spacer block between the split jambs in place during cladding and tiling, it stops the jambs distorting, and only comes out when the door is installed.
- Plumb the split jambs before fixing through the back post, and level the head/track before fixing it to the house frame.
Share this document
Email it to yourself
Loading…
This is the official Hume Doors document. Read it on this page or download the PDF. For the most current version, please confirm with Hume Doors. Allmat supplies the full Hume Evolution cavity range across Adelaide and South Australia , build yours and add it to a quote.
