James Hardie document
HardieDeck Installation Guide
The official James Hardie installation guide for the HardieDeck system, a non-combustible fibre cement decking board with a concealed fixing system for outdoor decks. It covers substructure requirements, joist spacing and loading, subfloor clearance and ventilation, the fixing and jointing components, sealing, and bushfire area rules. Read it on this page or download the PDF.
What this covers
- Substructure Requirements
- Joist Spacing & Loading
- Clearance & Ventilation
- Fixing & Jointing System
- Sealing
- Bushfire Area Requirements
Key things to remember
The essentials from this guide, at a glance.
- Joists must be at least 45mm wide; residential joist spacing is a maximum of 500mm for a standard layout and 300mm for a diagonal layout.
- Allow a minimum 150mm between the ground and the lowest framing member, plus 50mm unobstructed clearance for cross flow ventilation.
- HardieDeck must be sealed within 60 days of installation, or within 7 days around pools or within 1km of the coast.
- The system is not suitable for alpine areas (climate zone 8) or within 50m of breaking surf.
- Edge caps are fixed at a maximum of 500mm centres with a 25mm 8 gauge stainless steel screw.
- The HardieDeck system carries a 10 year warranty when installed with the Double Winged Base Jointer and Snap-In Top Strip.
Share this document
Email it to yourself
Loading…
This is the official James Hardie HardieDeck Installation Guide. Read it on this page or download the PDF. For the most current version, please confirm with James Hardie. Allmat supplies the HardieDeck range across Adelaide and South Australia. See sizes and add it to a quote.
